Chapter 1
Why Construction Has Hit a Ceiling
Construction is the largest sector of the global economy and also one of the least efficient. According to the McKinsey Global Institute, construction labor productivity grew by an average of 1% annually over two decades, compared with 2.8% across the global economy, while large projects typically finish 20% behind schedule and up to 80% over budget.¹ Engineers and managers spend a substantial share of their time searching for information, obtaining approvals and coordinating with other disciplines, rather than on production tasks.
Logistics, retail and finance automated their core processes long ago. Construction still relies on analog tools and paper processes that are manually transferred into digital systems and back again. The problem is not a lack of effort: three global trends have converged in construction at the same time.
Three Forces
Projects are becoming more complex. Safety, environmental and energy-efficiency requirements are multiplying building MEP systems. Modern architectural forms demand complex structural and envelope systems, normal-weight concrete and high-strength steel. Schedules remain tight, so cast-in-place concrete, facade and MEP works proceed simultaneously on different levels, sharply increasing the demands on coordination and workforce skills.
More parties are involved. A large project brings together thousands of workers and hundreds of engineers from dozens of contractors, suppliers and consultants, often from different countries. Each organization issues hundreds of requests, emails and documents recording continuous changes over many years, from site investigations through commissioning. Since the Tower of Babel, the greatest threat to a large construction project has been a breakdown in communication.
Smaller workforce available. Demographic trends are reducing labor supply in the United States, Europe, the Gulf states and Southeast Asia. Engineers are also in short supply: in its current form, construction is losing to other industries in the competition for talented graduates.
The Low-Margin Trap
Increasing project complexity and workforce shortages increase costs, while tendering procedures and the transfer of risk to contractors squeeze already thin margins. Little money remains for digitalization. As a result, most companies rely on email, messaging apps, spreadsheets and file storage as their main management tools: disconnected systems whose architecture cannot match the complexity of the work. Market leaders use advanced systems, but this only highlights the gap with the rest of the industry.
“No people, no profit, no accessible management tools”: this is what the construction industry is saying today.
The Root Cause Is Data Architecture
As a result, most companies operate within a digital environment in which:
data is fragmented into separate, disconnected documents; BIM has yet to become a unified project information system across mass construction;
information is scattered across formats, stakeholders, folders, attachments, correspondence and paper records on site;
changes do not propagate: no system automatically checks them or carries them through the chain of dependencies, so information is lost or distorted at every step;
management systems are blind: ERP records transactions and resources but cannot see the physical state of the asset.

Fig. 2. Why today’s systems cannot see the construction site
Data is fragmented, information is scattered, changes do not propagate, and management systems cannot see the physical state of the asset.
Another application will not solve this problem. A different architecture for data and management is needed.
¹ McKinsey Global Institute, “Reinventing Construction: A Route to Higher Productivity,” 2017.